TA-53-62 Cooling Tower Replacement Project Los Alamos National Laboratory
Owner: Los Alamos National Laboratory 87545
Architect: Chavez-Grieves Engineers
Contract No.: C90300029-CW
Completion Date: June 2000
Project Size: 14,160 Square Feet
Initial Contract Amount: $1,331,276 (Final) Contract Amount: $1,348,045
Initial Contract Schedule: 9/15/99 Final Contract Duration: 3/20/00
Technical Experience
Michael S Rich Contractors, Inc. was responsible for the installation of the structural steel, miscellaneous metal, steel handrail and aluminum
grating on the project. We installed approximately
- Seven tons of structural steel.
- Three tons of miscellaneous metals.
- Five hundred feet of handrail.
- One thousand square feet of aluminum grating.
We also installed the pre-engineered metal building. The building was approximately four thousand square feet.
|