TA-53-62 Cooling Tower
Replacement Project
Los Alamos National Laboratory

    Owner: Los Alamos National Laboratory 87545

    Architect: Chavez-Grieves Engineers

    Contract No.: C90300029-CW

    Completion Date: June 2000

    Project Size:  14,160 Square Feet

    Initial Contract Amount:   $1,331,276
    (Final) Contract Amount:   $1,348,045

    Initial Contract Schedule:   9/15/99
    Final Contract Duration:     3/20/00

Technical Experience

Michael S Rich Contractors, Inc. was responsible for the installation of the structural steel, miscellaneous metal, steel handrail and aluminum grating on the project. We installed approximately

  1. Seven tons of structural steel.
  2. Three tons of miscellaneous metals.
  3. Five hundred feet of handrail.
  4. One thousand square feet of aluminum grating.

We also installed the pre-engineered metal building. The building was approximately four thousand square feet.