Featured Project
TA-53-62 Cooling Tower Replacement Project #1
TA-53-62 Cooling Tower Replacement Project #1
Los Alamos National Laboratory
Owner: Los Alamos National Laboratory
Architect: Chavez-Grieves Engineers
Project Size: 14,160 Square Feet
Contract Amount: $1,348,045
Completion Date: June 2000
MSR was responsible for the installation of the structural steel, miscellaneous metal, steel handrail and aluminum grating on the project, installing approximately seven tons of structural steel; three tons of miscellaneous metals; five hundred feet of handrail; 1000 square feet of aluminum grating; and the pre-engineered metal building.
